Back to Sandbox Hub
Fleet Builder & Digital Twin
Build operating models, plan capacity requirements, model lifecycle carbon, and analyze breakdown exposure.
Projection Live Active
Projection & Governance Bar
Verified projections. This interface renders governed state and does not create independent truth.
Fleet TCO Projectiontrace-fleet-builder-20260705-1915
98% Matchactive
Carbon Lifecycle Projectiontrace-carbon-lifecycle-20260705-1915
96% Matchpending revalidation
Maintenance Exposure Projectiontrace-maintenance-20260705-1915
97% Matchactive
Authority Eligibility Projectiontrace-authority-20260705-1915
99% Matchactive
Breakdown Exposure Projectiontrace-breakdown-20260705-1915
97% Matchactive
Truck Catalogue & Reference Filters
Filtered Catalogue (18)
Target Fleet Canvas
Click Add in the catalogue panel to build your simulation portfolio.
Your simulation fleet is empty.Add trucks from the left catalog panel to begin.
Fleet Count0active trucks
Total Payload0tcapacity
Monthly Cost€0lease + service
Embodied Carbon0tCO₂e factory
Truck Inspector
Active
Volvo Trucks
FH Aero 500 4x2
Capacity25t · 13.6 LDM
Fuel TypeDiesel Euro VI
Factory Carbon33 tCO₂e
Monthly Lease€3560
Roadside Passport VINVH-93F2-001
Telemetry SoftwareVolvo Connect 2026.1
FTL / LTL Planning & Recommendation Engine
Determine optimal asset allocations dynamically using tonnes, loading meters, and pallet footprints.
Top Recommendation Match
Volvo Trucks · FH Aero 500 4x2
Estimated trip emissions: 0.61 tCO₂e over 620 km.
| Matched Vehicle Class | Confidence Score | Capacity Limits | Primary Fuel |
|---|---|---|---|
| Volvo Trucks FH Aero 500 4x2 | 100% match | 25t · 13.6 LDM | Diesel Euro VI |
| Scania R 460 Super 4x2 | 100% match | 26t · 13.6 LDM | Diesel Euro VI |
| Mercedes-Benz Trucks Actros L 1848 | 100% match | 25t · 13.6 LDM | Diesel Euro VI |
TCO & Truck-as-a-Service modeler
Simulate scenario operating costs per km and contract exposures.
Estimated Energy Cost€65,280 / year
Total Annual Cost€117,280
Estimated Cost per km€0.98/km
Cost per pallet-km€0.0296/p-km
Breakdown Action Engine
Determine true financial risk of breakdown incidents on active SLAs.
Repair & Recovery Cost€4,600
Uptime Idle Loss€4,340
Total Financial Incident Risk€15,440