TrustedTrucks Logo
Logistics Lifecycle•Sovereign Ledger Active

Stage 3: UBO Identification & Verification

Process flow, GoQuorum Raft zero-gas anchors, Kafka topic tt.user.registration.v1, and SENRA v18.10 compliance requirements for stage 3 (UBO Identification & Verification) of the B2B logistics lifecycle.

Stage 3 is a canonical milestone in the 105-Stage TrustedTrucks Sovereign Economic Network Reference Architecture (SENRA v18.10) logistics and trade-finance lifecycle.

Stage Characteristics

  • Canonical ID: TT-STAGE-003
  • SENRA Trust Domain: VV
  • Lifecycle Phase: Phase 0 (Onboarding)
  • MES Type: DESA
  • Constitutional Effect: UBO linkage record
  • Primary Kafka Plane: Plane A
  • Canonical Kafka Topic: tt.user.registration.v1
  • SENRA Architectural Trigger: EVIDENCE_ADMISSION_REQUEST
  • Execution Consensus: GoQuorum Raft CFT (Zero-Gas, ~50ms block time, Raft Port 22003)
  • Contract Order ID Mandate: NO

CSREAD Permission Registry

The following roles are constitutionally authorized to perform operations on this stage:

  • Create (C): Forwarder, Carrier, Shipper
  • Submit (S): Onboarding Candidate, Carrier, Shipper
  • Read (R): All Verified Participants
  • Edit (E): Onboarding Entity
  • Approve (A): Compliance Officer, Executive
  • Delete (D): Platform Operator, Executive

IoT & Telemetry Domain

  • Telemetry Stream: Security & Compliance (iot_security_compliance)
  • Attestation Framework: ISO 14083 / GLEC Framework v3.2 compliant sensor ingress

Operational Workflow

During Stage 3 (UBO Identification & Verification), the platform executes the following deterministic sub-processes:

  1. Intake & Verification: Renders inputs from preceding steps, validates ECDSA signatures against the HSM Signer Pool, and verifies identity via IAM Tier (Tier 2 / A2).
  2. Deterministic State Commit: The authorized actor dispatches a state mutation anchored to the GoQuorum Raft private ledger with zero transaction fees.
  3. Kafka Event Publication: Emits a strongly typed event payload to tt.user.registration.v1 on Plane A.
  4. Outbox Projection & Downstream Sync: The Transactional Outbox worker projects the committed ledger state into the KBIAQT indexer and updates the PT-0 Command Centre and PT-1/2/3 commercial platforms.
Ecosystem Progression

Follow the standardized operational sequence of stages.

Proceed to Next Stage→
Normative Precedence NoticeThis specification document is a binding part of Release Bundle v7.0. In case of operational or discrepancies, the Integration Yellow Paper TT-ARCH-REL-001 takes precedence.